King’s Harbour Master Portsmouth
LNTM 39/24
1. NOTICE IS HEREBY GIVEN by the King's Harbour Master Portsmouth that Surveying Operations and Maintenance Dredging will be conducted in the maintained areas within Portsmouth Harbour and its approach channels from 6 – 21 March 2024. (Daily 0700-1900)
2. The contractor for the works will be Boskalis Westminster Ltd using the plough dredger “AVENGER” (LOA 20.0m) with the support vessel "ARAMIS" carrying out survey operations. All vessels will display the appropriate signals when conducting survey and dredging operations.
3. Mariners are requested to keep a good lookout and pass at slow speed while dredging operations are being conducted. All dredging and surveying craft will maintain a listening watch on VHF Ch 11 throughout operations.
4. KHM Harbour Control will be kept informed of work in progress and will de-conflict movements with other marine traffic. They can be contacted on VHF Ch 11 or by telephoning 02392 723689 for the latest information.
5. Cancel this LNTM on 22 March 2024.