King’s Harbour Master Portsmouth
LNTM 31/25
1. NOTICE IS HEREBY GIVEN by the King’s Harbour Master Portsmouth that Autonomous Surface Vessel (ASV) trials will be conducted within the Dockyard Port of Portsmouth over the period 1 January - 31 March 2025.
2. The ASV will be trialled in Hill Head and Stokes Bay, with weather contingency locations of Osborne Bay and the water East of Portsmouth Harbour’s main channel and submarine barrier.
3. The designated trials period will be from 0930 – 1730 daily and include the ASV operating in remote/autonomous mode within the trials area. Only one ASV will be trailed at any given time. The ASV will be towed on transit between the Hamble River and the trials location.
4. The ASV, of which there may be several, is a grey monohulled (LOA 5.7m). A RHIB ‘ALPHA’ will act as the safety and support boat during the period of the trials. The safety vessel will attend all times of the trials period.
5. The safety vessel will be listening on VHF Ch 11/12.
6. All trials vessels will conform to the International Regulations for Preventing Collisions at Sea (COLREGs) and The Dockyard Port of Portsmouth Regulations.
7. Cancel this LNTM 1 April2025.
Wednesday 01 Jan 2025
Stay informed
To receive Notices and/or Shipping Movements, please make your selection below.