King’s Harbour Master Portsmouth
LNTM 120/24
1. NOTICE IS HEREBY GIVEN by the King's Harbour Master Portsmouth that Maintenance Dredging will be conducted in the maintained areas within Portsmouth Harbour and its approach channels from 31 October to 6 November 2024.
2. The contractor for the works will be Boskalis Westminster Ltd using the Trailing Suction Hopper Dredger (TSHD) “CAUSEWAY” (LOA 97.7m) to the support the operations. The vessel will display the appropriate signals when conducting survey and dredging operations.
3. Mariners are requested to keep a good lookout and pass at slow speed while dredging operations are being conducted. All dredging and surveying craft will maintain a listening watch on VHF Ch 11 throughout operations.
4. KHM Harbour Control will be kept informed of work in progress and will de-conflict movements with other marine traffic. They can be contacted on VHF Ch 11 or by telephoning 02392 723689 for the latest information.
5. Cancel this LNTM on 8 November 2024.
Thursday 24 Oct 2024
Stay informed
To receive Notices and/or Shipping Movements, please make your selection below.
Follow KHM Portsmouth on X
@khmportsmouth